PAT | FRANKIEvídeo

Mast off (a lot to go wrong) | BOAT DAMAGE DISASTER Part 3

10 de novembro de 2024 · 19 min · 16K visualizações

O que este vídeo aborda

Following structural damage to their yacht, Pat and Frankie initiate a total interior and exterior teardown to facilitate repairs.1:54 After filing an insurance claim and hiring a surveyor, the couple spends four weeks removing the interior, sails, and boom.0:57 To access the hull structure, they hire a crane to unstep the 21-meter mast while the boat remains on the hard.1:26 Because the mast passes through the deck, the crew uses a main halyard and two safety lines attached to the spreaders to stabilize the rig during the lift.10:16 They loosen the rig and mast plate screws before the crane operator lifts the mast clear of the hull.11:14 With the mast removed, the couple prepares for a fiber specialist to inspect the structural damage.18:40 The process concludes with the boat on the hard and the mast successfully lowered.14:08

Assistir no YouTube

Mais de PAT | FRANKIE

12.5 days of REALITY crossing the Atlantic Ocean | Part 3 #sailingjun. de 2025Atlantic Crossing Part 2 | The Night from Hell + Discovering Cape Verdemai. de 2025Leaving Everything Behind - The First 900 NM | Atlantic Crossing Part 1abr. de 2025The ULTIMATE Shakedown Sailfev. de 2025

De PAT | FRANKIE — veja o barco, a tripulação e cada vídeo analisado do canal.

The Sailing Directory Newsletter

Um e-mail com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira seu endereço para receber sua própria cópia.

Reportar um problema