Vie d'écumeβίντεο
The odd jobs of the last 2 months
12 Φεβρουαρίου 2021 · 18 λεπτά · 799 προβολές · Toulon
Τι καλύπτει αυτό το βίντεο
Maintenance tasks on the sailboat Vagabond include installing a new electrical panel, reorienting water pumps, and mitigating mast noise. The owner replaced a faulty electrical switchboard with a new unit featuring illuminated switches and spare capacity.7:44 To prevent mechanical failure, the crew reoriented the pressurized water pumps from a vertical to a horizontal position, as the previous configuration caused the internal mechanism to detach.8:04 To dampen resonant noise inside the mast, the owner injected two canisters of expanding foam into the structure.3:36
Additional repairs involve moisture control and hardware upgrades. After discovering mold beneath the mattress, the owner sanded and repainted the affected area and installed Quechua ventilation mats to improve airflow.10:16 To secure curtains, the crew replaced clips with adhesive Velcro strips.9:16 The owner also added two mooring lines to handle 50-knot gusts and installed rubber snubbers to reduce noise.1:36 Finally, the owner installed an inline fuel filter on the outboard motor and attempted to clean salvaged A4 fenders using enzymatic cleaners and acetone, though the plastic surface remained tacky.0:58
Σκάφη σε αυτό το βίντεο
Περισσότερα από το Vie d'écume
Από Vie d'écume — δείτε το σκάφος του καναλιού, το πλήρωμα και κάθε αναλυμένο βίντεο.
The Sailing Directory Newsletter
Ένα email με τις καλύτερες ανακαλύψεις του στόλου — τις στιγμές, τα σκάφη και τις ιστορίες που αξίζουν τον χρόνο παρακολούθησής σας. Εισάγετε τη διεύθυνσή σας για να λάβετε το δικό σας αντίγραφο.



