Plan-Seaβίντεο
High Stakes Rigging: Repairing the Topping Lift Aloft | (EP. 020)
27 Σεπτεμβρίου 2025 · 23 λεπτά · 2K προβολές
Τι καλύπτει αυτό το βίντεο
The crew of a Bristol 45.5 prepares for a transition to liveaboard life by completing several refit projects at a boatyard.0:38 They install a 12-volt Dometic fridge and freezer, requiring new wiring and a 20-amp fuse.1:40 The team upgrades the navigation suite by mounting a 12-inch BNG chartplotter into a used nav pod purchased from eBay, which requires custom fabrication using aluminum and Starboard to fit the existing pedestal.10:24 They also replace the jib halyard, spinnaker line, and main sheet by sewing new lines to the old ones and pulling them through the mast.14:04 To address a broken topping lift, one crew member goes aloft to the masthead.18:47 After failing to remove the corroded fitting with needle-nose pliers and a flathead screwdriver, he uses a chisel to break the obstruction free, successfully clearing the path for a new line.21:08 The crew also installs a new alarm system for engine and bilge monitoring and prepares for a future Starlink installation.3:23
Σκάφη σε αυτό το βίντεο
Περισσότερα από το Plan-Sea
Από Plan-Sea — δείτε το σκάφος του καναλιού, το πλήρωμα και κάθε αναλυμένο βίντεο.
The Sailing Directory Newsletter
Ένα email με τις καλύτερες ανακαλύψεις του στόλου — τις στιγμές, τα σκάφη και τις ιστορίες που αξίζουν τον χρόνο παρακολούθησής σας. Εισάγετε τη διεύθυνσή σας για να λάβετε το δικό σας αντίγραφο.



