Plan-Seavideo
High Stakes Rigging: Repairing the Topping Lift Aloft | (EP. 020)
27 de septiembre de 2025 · 23 min · 2K vistas
¿Qué cubre este video?
The crew of a Bristol 45.5 prepares for a transition to liveaboard life by completing several refit projects at a boatyard.0:38 They install a 12-volt Dometic fridge and freezer, requiring new wiring and a 20-amp fuse.1:40 The team upgrades the navigation suite by mounting a 12-inch BNG chartplotter into a used nav pod purchased from eBay, which requires custom fabrication using aluminum and Starboard to fit the existing pedestal.10:24 They also replace the jib halyard, spinnaker line, and main sheet by sewing new lines to the old ones and pulling them through the mast.14:04 To address a broken topping lift, one crew member goes aloft to the masthead.18:47 After failing to remove the corroded fitting with needle-nose pliers and a flathead screwdriver, he uses a chisel to break the obstruction free, successfully clearing the path for a new line.21:08 The crew also installs a new alarm system for engine and bilge monitoring and prepares for a future Starlink installation.3:23
Barcos en este video
Más de Plan-Sea
De Plan-Sea — ve el barco, la tripulación y cada video analizado del canal.
The Sailing Directory Newsletter
Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que valen tu tiempo de visualización. Ingresa tu propia dirección para obtener tu propia copia.



