Sailing Squibβίντεο
Sailing Squib Update August 30, 2025
30 Αυγούστου 2025 · 1 λεπτά · 853 προβολές · Velikogradice
Τι καλύπτει αυτό το βίντεο
The AIS antenna cable on Squib snapped inside the weather locker where the rudder quadrant sits, leaving the system unable to acquire satellites for several days.0:09 The repair involved soldering the inner copper core, wrapping it with insulating tape, shielding it with aluminum foil, rebuilding the outer copper braid, then sealing the whole repair with heat-shrink tubing and insulating tape.0:17 After reconnecting, AIS restored and other vessels appeared on the display again.Watch Squib arrived at Velikogradice and anchored in a small harbor basin roughly three kilometers from the town in four meters of water.0:47 The next day the crew plans to clear out of the country, then motor 15 km across to Romania, with the Iron Gate — the Danube gorge — the next major waypoint ahead.0:59 Position tracking on MarineTraffic is expected to resume once underway.1:23
Περισσότερα από το Sailing Squib
Από Sailing Squib — δείτε το σκάφος του καναλιού, το πλήρωμα και κάθε αναλυμένο βίντεο.
The Sailing Directory Newsletter
Ένα email με τις καλύτερες ανακαλύψεις του στόλου — τις στιγμές, τα σκάφη και τις ιστορίες που αξίζουν τον χρόνο παρακολούθησής σας. Εισάγετε τη διεύθυνσή σας για να λάβετε το δικό σας αντίγραφο.



