Sailing Squibvideo

Sailing Squib Update August 30, 2025

30. august 2025 · 1 min · 857 visninger · Velikogradice

Hva denne videoen dekker

The AIS antenna cable on Squib snapped inside the weather locker where the rudder quadrant sits, leaving the system unable to acquire satellites for several days.0:09 The repair involved soldering the inner copper core, wrapping it with insulating tape, shielding it with aluminum foil, rebuilding the outer copper braid, then sealing the whole repair with heat-shrink tubing and insulating tape.0:14 After reconnecting, AIS restored and other vessels appeared on the display again.0:38 Squib arrived at Velikogradice and anchored in a small harbor basin roughly three kilometers from the town in four meters of water.0:47 The next day the crew plans to clear out of the country, then motor 15 km across to Romania, with the Iron Gate — the Danube gorge — the next major waypoint ahead.1:06 Position tracking on MarineTraffic is expected to resume once underway.1:08

Se på YouTube

Mer fra Sailing Squib

Sailing Squib - May 2026/3sep. 2026Sailing Squib May 2026 /2aug. 2026Sailing Squib - Contemporary Witnessjuli 2026Sailing Squib - May 2026 /1juli 2026

Fra Sailing Squib – se kanalens båt, mannskap og alle analyserte videoer.

The Sailing Directory Newsletter

Én e-post med flåtens beste funn – øyeblikkene, båtene og historiene som er verdt din seertid. Skriv inn din egen adresse for å få din egen kopi.

Rapporter et problem