Sailing SV Delosβίντεο

The Hull is DONE 🤯 On To Phase 2 of the Build (Custom Aluminum Catamaran Build Pt. 18)

20 Δεκεμβρίου 2024 · 22 λεπτά · 489K προβολές · Australia

Τι καλύπτει αυτό το βίντεο

The crew moves their custom aluminum catamaran, Delos 2.0, from shed six to shed seven to begin the interior fit-out and systems installation.0:58 To ensure the hull remains level for interior construction, the team uses a laser level to align the boat on its supports, adjusting the position with logs and aluminum bars.6:14 The rudder installation involves fitting a CETL plastic bearing into the skeg, requiring precise material removal to achieve a snug friction fit.13:22 To secure the pintle plate to the aluminum skeg without welding, the crew drills and taps M10 holes, using Tef-Gel and Loctite to mitigate galvanic corrosion between the stainless steel bolts and the aluminum.15:00 The team also begins installing ForSpar Marilon composite seacocks and through-hulls.16:36 To maintain hull thickness, they TIG-weld 8mm aluminum backing plates inside the hull before cutting holes for the fittings.17:43 The plumbing design utilizes a gravity-fed gray water system to reduce the maintenance issues associated with traditional gray water tanks.20:37

Παρακολουθήστε στο YouTube

Περισσότερα από το Sailing SV Delos

Fit or FAIL 🫣 Building Our Own Aluminum Catamaran Pt. 85Σεπ 2026This Is Where It Gets INTERESTING…Aluminum Catamaran Build Pt. 84Αυγ 2026EVERY INCH COUNTS....Aluminum Catamaran Build Pt. 83Αυγ 2026FIRST TEST: The Last Dinghy We'll Ever Buy??? Aluminum Catamaran Build Pt. 82Αυγ 2026

Από Sailing SV Delos — δείτε το σκάφος του καναλιού, το πλήρωμα και κάθε αναλυμένο βίντεο.

The Sailing Directory Newsletter

Ένα email με τις καλύτερες ανακαλύψεις του στόλου — τις στιγμές, τα σκάφη και τις ιστορίες που αξίζουν τον χρόνο παρακολούθησής σας. Εισάγετε τη διεύθυνσή σας για να λάβετε το δικό σας αντίγραφο.

Αναφορά προβλήματος