Sailing SV Delosvideo
The Hull is DONE 🤯 On To Phase 2 of the Build (Custom Aluminum Catamaran Build Pt. 18)
20 dicembre 2024 · 22 min · 489K visualizzazioni · Australia
Cosa tratta questo video
The crew moves their custom aluminum catamaran, Delos 2.0, from shed six to shed seven to begin the interior fit-out and systems installation.0:58 To ensure the hull remains level for interior construction, the team uses a laser level to align the boat on its supports, adjusting the position with logs and aluminum bars.6:14 The rudder installation involves fitting a CETL plastic bearing into the skeg, requiring precise material removal to achieve a snug friction fit.13:22 To secure the pintle plate to the aluminum skeg without welding, the crew drills and taps M10 holes, using Tef-Gel and Loctite to mitigate galvanic corrosion between the stainless steel bolts and the aluminum.15:00 The team also begins installing ForSpar Marilon composite seacocks and through-hulls.16:36 To maintain hull thickness, they TIG-weld 8mm aluminum backing plates inside the hull before cutting holes for the fittings.17:43 The plumbing design utilizes a gravity-fed gray water system to reduce the maintenance issues associated with traditional gray water tanks.20:37
Altro da Sailing SV Delos
Da Sailing SV Delos — guarda la barca, l'equipaggio e ogni video analizzato del canale.
The Sailing Directory Newsletter
Una email con le migliori scoperte della flotta — i momenti, le barche e le storie che meritano il tuo tempo di visione. Inserisci il tuo indirizzo per riceverne una copia.



