Sailing Umaβίντεο

Delayed by 0% Chance of Rain | Step 440

16 Μαΐου 2025 · 18 λεπτά · 116K προβολές

Τι καλύπτει αυτό το βίντεο

The crew of the sailboat Uma prepares the hull for a final topcoat application in Olbia, Sardinia, after completing extensive fairing and priming. To address pinholes and surface imperfections, they use All Fair epoxy filler for large areas and Arrowwave for quick-curing spot repairs.3:30 They select International Perfection Pro for the finish, choosing it for its ability to self-level and achieve a spray-like gloss when applied by brush and roller.7:21 The process requires three layers of undercoat, each sanded between applications.7:32 Despite 13 hours of labor to prepare the surface, the crew postpones the final topcoat due to an unreliable weather forecast showing rain in the immediate vicinity of the shipyard.15:09 Because Perfection Pro has a long curing time, even minor precipitation or condensation during application would ruin the finish and necessitate sanding the entire coat off.15:41 The crew opts to wait for a stable weather window to ensure the multi-coat system can be applied within the recommended recoat intervals.17:33

Παρακολουθήστε στο YouTube

Περισσότερα από το Sailing Uma

We Ditched Our Steering Wheel (And Built Something Better) | Step 496Σεπ 2026We're Finally Setting Sail Again!Σεπ 20264 Hours to Rig Solar for an 8-Month Solo CircumnavigationΣεπ 2026Solar Sponsor Backed Out Before Sailing Around the World !Σεπ 2026

Από Sailing Uma — δείτε το σκάφος του καναλιού, το πλήρωμα και κάθε αναλυμένο βίντεο.

The Sailing Directory Newsletter

Ένα email με τις καλύτερες ανακαλύψεις του στόλου — τις στιγμές, τα σκάφη και τις ιστορίες που αξίζουν τον χρόνο παρακολούθησής σας. Εισάγετε τη διεύθυνσή σας για να λάβετε το δικό σας αντίγραφο.

Αναφορά προβλήματος