Sailing Umavídeo

Delayed by 0% Chance of Rain | Step 440

16 de mayo de 2025 · 18 min · 116K visitas

Qué cubre este vídeo

The crew of the sailboat Uma prepares the hull for a final topcoat application in Olbia, Sardinia, after completing extensive fairing and priming. To address pinholes and surface imperfections, they use All Fair epoxy filler for large areas and Arrowwave for quick-curing spot repairs.3:30 They select International Perfection Pro for the finish, choosing it for its ability to self-level and achieve a spray-like gloss when applied by brush and roller.7:21 The process requires three layers of undercoat, each sanded between applications.7:32 Despite 13 hours of labor to prepare the surface, the crew postpones the final topcoat due to an unreliable weather forecast showing rain in the immediate vicinity of the shipyard.15:09 Because Perfection Pro has a long curing time, even minor precipitation or condensation during application would ruin the finish and necessitate sanding the entire coat off.15:41 The crew opts to wait for a stable weather window to ensure the multi-coat system can be applied within the recommended recoat intervals.17:33

Ver en YouTube

Más de Sailing Uma

We Ditched Our Steering Wheel (And Built Something Better) | Step 496sept 2026We're Finally Setting Sail Again!sept 20264 Hours to Rig Solar for an 8-Month Solo Circumnavigationsept 2026Solar Sponsor Backed Out Before Sailing Around the World !sept 2026

De Sailing Uma — mira el barco del canal, la tripulación y cada vídeo analizado.

The Sailing Directory Newsletter

Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que merecen tu tiempo de visionado. Introduce tu dirección para recibir tu propia copia.

Informar de un problema