Sail Lifeβίντεο

⛵️ 3D scanning our old windows and a small plaster mold setback. New windows part 5! Ep 672

29 Μαρτίου 2026 · 25 λεπτά · 83K προβολές

Τι καλύπτει αυτό το βίντεο

To manufacture replacement windows for an Antares Yachts 44, the project involves thermoforming 10mm acrylic sheets over custom-made plaster molds. The process begins by using an EinScan Vega 3D scanner to capture the curvature of existing boat windows.1:02 To ensure accurate data capture on the smooth, reflective acrylic, the surface is coated with 3D scanning spray and marked with 12mm tracking dots.15:56 The resulting point cloud is converted into a 3D mesh for CAD modeling.16:37

For the molds, a CNC machine cuts a plug from MDF, which is then sealed with TotalBoat High Performance Epoxy and coated with wax.3:55 Plaster of Paris is poured into the plug to create the final mold, with some tests incorporating 3% chopped fiberglass strands for added strength.5:33 To optimize heat distribution during the thermoforming process, a four-channel data logger monitors temperatures inside and above the plaster molds while they dry in a 6000-watt DIY electric oven.14:47 The project also includes installing an Airlock 1 air purification system to manage cabin odors.9:10

Παρακολουθήστε στο YouTube

Σκάφη σε αυτό το βίντεο

Antares Yachts 44Το σκάφος τους

Περισσότερα από το Sail Life

The road back to boat work: Bunker roof, done! Ep. 699Οκτ 2026The road back to boat work: A bunker surprise. Ep. 698Οκτ 2026BUNKER vs. LASER - xTool MetalFab laser welder and CNC Ep. 697Σεπ 2026The road back to boat work: Bunker Makeover! Ep. 696Σεπ 2026

Από Sail Life — δείτε το σκάφος του καναλιού, το πλήρωμα και κάθε αναλυμένο βίντεο.

The Sailing Directory Newsletter

Ένα email με τις καλύτερες ανακαλύψεις του στόλου — τις στιγμές, τα σκάφη και τις ιστορίες που αξίζουν τον χρόνο παρακολούθησής σας. Εισάγετε τη διεύθυνσή σας για να λάβετε το δικό σας αντίγραφο.

Αναφορά προβλήματος