Project Brupegβίντεο
What is happening with the electrics - Project Brupeg Ep.358
2 Ιουνίου 2024 · 32 λεπτά · 28K προβολές
Τι καλύπτει αυτό το βίντεο
The owners of the trawler Brewpeg are replacing their entire electrical system after a short circuit in a charge controller caused multiple failures.2:50 The new installation centers on a Victron power management suite, including new lithium batteries, inverters, Lynx distributors, and a smart BMS.3:48 To meet Australian safety standards, the crew is constructing a vented aluminum battery box with a 10mm acrylic front and a 38mm external vent pipe.8:51 The project also involves relocating the AC and DC breaker panels from an awkward wheelhouse cupboard to a new, accessible cabinet with clear acrylic covers for monitoring.26:22 The team is currently inventorying parts and preparing mounting surfaces, including a 3mm alloy plate for the new breaker panel and plywood backing boards.25:54 Once the electrical components are installed and programmed by a professional marine electrician, the vessel will begin sea trials. The previous, unreliable inverters are being removed to ensure system redundancy and stability for future offshore passages.31:23
Περισσότερα από το Project Brupeg
Από Project Brupeg — δείτε το σκάφος του καναλιού, το πλήρωμα και κάθε αναλυμένο βίντεο.
The Sailing Directory Newsletter
Ένα email με τις καλύτερες ανακαλύψεις του στόλου — τις στιγμές, τα σκάφη και τις ιστορίες που αξίζουν τον χρόνο παρακολούθησής σας. Εισάγετε τη διεύθυνσή σας για να λάβετε το δικό σας αντίγραφο.



