Project Brupegvídeo
What is happening with the electrics - Project Brupeg Ep.358
2 de junho de 2024 · 32 min · 28K visualizações
O que este vídeo aborda
The owners of the trawler Brewpeg are replacing their entire electrical system after a short circuit in a charge controller caused multiple failures.2:50 The new installation centers on a Victron power management suite, including new lithium batteries, inverters, Lynx distributors, and a smart BMS.3:48 To meet Australian safety standards, the crew is constructing a vented aluminum battery box with a 10mm acrylic front and a 38mm external vent pipe.8:51 The project also involves relocating the AC and DC breaker panels from an awkward wheelhouse cupboard to a new, accessible cabinet with clear acrylic covers for monitoring.26:22 The team is currently inventorying parts and preparing mounting surfaces, including a 3mm alloy plate for the new breaker panel and plywood backing boards.25:54 Once the electrical components are installed and programmed by a professional marine electrician, the vessel will begin sea trials. The previous, unreliable inverters are being removed to ensure system redundancy and stability for future offshore passages.31:23
Mais de Project Brupeg
De Project Brupeg — veja o barco, a tripulação e cada vídeo analisado do canal.
The Sailing Directory Newsletter
Um e-mail com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira seu endereço para receber sua própria cópia.



