The Marinerβίντεο

T Zero- Time to Get Going

26 Μαρτίου 2026 · 12 λεπτά · 2K προβολές

Sailor adjusts boom on deck under blue sky

Τι καλύπτει αυτό το βίντεο

Chris prepares his boat for departure from a French marina, marking "T-Zero" as the final day of dockside maintenance before heading to England.11:33 The vessel currently features a problematic water tank system where a single take-off from the port tank requires heeling the boat to transfer water from the starboard side; a future manifold installation will resolve this.0:39 Maintenance tasks completed include cleaning the bilges, jet-washing the deck, and installing a new fuel strainer and transfer pump.6:07 Rig tuning is deferred until the boat reaches a waiting dock to avoid local occupational health and safety regulations regarding mast work near active construction cranes.4:12 The departure plan involves using a stern line to pivot the boat away from the dock while engaging the engine astern.3:19 Future upgrades include mounting an induction cooktop, supported by a lithium-ion battery bank, solar panels, and a forthcoming hydro-generator.9:58 The boat is scheduled to transit the lock at the next tide to take on fuel and retrieve the mainsail.7:27

Παρακολουθήστε στο YouTube

Περισσότερα από το The Mariner

Sailing to Newport, my Trimaran Project & Notes on Archive Management for L- Matrix AI'sΙουλ 2026Taking a Look Around the Waterfront in Lunenburg, Nova ScotiaΙουν 2026Solo Docking an 80ft Yacht Without Use Of The Auxillary EngineΜαΐ 2026Introducing Longitudinal AI SystemsΜαΐ 2026

Από The Mariner — δείτε το σκάφος του καναλιού, το πλήρωμα και κάθε αναλυμένο βίντεο.

The Sailing Directory Newsletter

Ένα email με τις καλύτερες ανακαλύψεις του στόλου — τις στιγμές, τα σκάφη και τις ιστορίες που αξίζουν τον χρόνο παρακολούθησής σας. Εισάγετε τη διεύθυνσή σας για να λάβετε το δικό σας αντίγραφο.

Αναφορά προβλήματος