The Marinervídeo

T Zero- Time to Get Going

26 de marzo de 2026 · 12 min · 2K visitas

Sailor adjusts boom on deck under blue sky

Qué cubre este vídeo

Chris prepares his boat for departure from a French marina, marking "T-Zero" as the final day of dockside maintenance before heading to England.11:33 The vessel currently features a problematic water tank system where a single take-off from the port tank requires heeling the boat to transfer water from the starboard side; a future manifold installation will resolve this.0:39 Maintenance tasks completed include cleaning the bilges, jet-washing the deck, and installing a new fuel strainer and transfer pump.6:07 Rig tuning is deferred until the boat reaches a waiting dock to avoid local occupational health and safety regulations regarding mast work near active construction cranes.4:12 The departure plan involves using a stern line to pivot the boat away from the dock while engaging the engine astern.3:19 Future upgrades include mounting an induction cooktop, supported by a lithium-ion battery bank, solar panels, and a forthcoming hydro-generator.9:58 The boat is scheduled to transit the lock at the next tide to take on fuel and retrieve the mainsail.7:27

Ver en YouTube

Más de The Mariner

Sailing to Newport, my Trimaran Project & Notes on Archive Management for L- Matrix AI'sjul 2026Taking a Look Around the Waterfront in Lunenburg, Nova Scotiajun 2026Solo Docking an 80ft Yacht Without Use Of The Auxillary Enginemay 2026Introducing Longitudinal AI Systemsmay 2026

De The Mariner — mira el barco del canal, la tripulación y cada vídeo analizado.

The Sailing Directory Newsletter

Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que merecen tu tiempo de visionado. Introduce tu dirección para recibir tu propia copia.

Informar de un problema