back at it; BOAT LIFE [ep 95]
21 de diciembre de 2023 · 15 min · 86K visitas · Grenada
Qué cubre este vídeo
Lauren Landers prepares to depart Grenada after completing major boat projects, including the installation of a GPS positioning mount.0:29 Delays persist regarding a solar controller stuck in customs and a faulty Starlink wire.7:59 The vessel reaches 500 engine hours while moving between anchorages in Grenada to find calmer conditions.6:57 Plans to install a Hydrovane require raising the mounting pole, a modification scheduled for St. Martin.9:06 To manage power needs without the new solar controller, the electrical system will temporarily run on a 50-amp unit.11:50 After checking out of the marina, the crew motors out to test the autopilot and deploy sails in 20 to 25 knots of wind.12:57 Despite initial progress, the 400-nautical-mile passage becomes the most challenging sail to date.15:08
Barcos en este vídeo
Más de Lauren Landers Sailing
De Lauren Landers Sailing — mira el barco del canal, la tripulación y cada vídeo analizado.
The Sailing Directory Newsletter
Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que merecen tu tiempo de visionado. Introduce tu dirección para recibir tu propia copia.



