Entre Terras e Maresvídeo

AFTER A YEAR WE FINALLY FINISHED THE AFT CABIN T1.ep153

9 de febrero de 2025 · 21 min · 447 visitas

Qué cubre este vídeo

Edgar and Sâmia complete the interior finishing of the aft cabin and adjacent bathroom, installing ivory-colored Formica laminate on bulkheads and custom cabinetry.0:09 The project involves measuring and cutting panels to match existing bulkhead tones, requiring precise adjustments to account for height variations and curved surfaces.1:44 The crew uses contact adhesive to bond the laminate, temporarily mounting doors to verify fit before installing push-lock latches and edge banding.8:13 To maximize material efficiency, they prioritize the bathroom wall paneling, using remaining offcuts for smaller cabinet doors and drawer fronts.15:09 The installation process includes fitting drawers and cabinets, though final tasks such as attaching hardware, installing mirror-faced doors, and securing the head remain pending.18:28 A temporary mattress remains in the cabin to provide a resting space during the ongoing refit.19:41 The work demonstrates the challenges of interior joinery in confined spaces, emphasizing the need for careful planning to minimize material waste and ensure proper alignment of cabinet doors and drawers.

Ver en YouTube

Más de Entre Terras e Mares

90% of the STRUCTURE is READY S1.ep 183jul 2026WE FINISHED the bow cabin LAMINATE ! S1.ep182jun 2026WE DID IT, WE FINISHED PART OF THE FORMICA IN THE BOW SUITE S1.ep 181jun 2026This week the focus was on something elsejun 2026

De Entre Terras e Mares — mira el barco del canal, la tripulación y cada vídeo analizado.

The Sailing Directory Newsletter

Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que merecen tu tiempo de visionado. Introduce tu dirección para recibir tu propia copia.

Informar de un problema