Project Brupegvídeo

Getting ready for our first project - Project Brupeg Ep.367

4 de agosto de 2024 · 19 min · 27K visitas

Qué cubre este vídeo

Damien and Jess perform extensive deck maintenance on their vessel, Brewpeg, a former fishing trawler, to prepare for a partnership with the Australian Navy Cadets in Bundaberg, Queensland.17:44 The work involves needle-gunning rust, grinding welds, and applying Jotamastic 90, a high-build epoxy etch paint, to the side and back decks.2:35 The crew uses acetone to prep surfaces before applying a yellow undercoat and a final non-slip grey topcoat containing rubberized grip.15:06 During the process, Jess sustains a rib injury while maneuvering a heavy stainless steel exhaust shroud between the wharf and the boat.15:57 The project involves moving the vessel to the local training ship wharf, TS Bundaberg, to provide maritime training for cadets on systems including radar, navigation, and onboard engines.17:53 The crew plans to continue these maintenance efforts while preparing for future coastal passages.

Ver en YouTube

Más de Project Brupeg

What caused the steering to fail - Project Brupeg Ep.463oct 2026CHAOS! & our first Night Time Trailer Haul Out - Project Brupeg Ep.462sept 2026Look, It's possible we should have cleaned this before now... Project Brupeg Ep.461sept 2026The Ridiculously Powerful Davit Winch - Project Brupeg Ep.460sept 2026

De Project Brupeg — mira el barco del canal, la tripulación y cada vídeo analizado.

The Sailing Directory Newsletter

Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que merecen tu tiempo de visionado. Introduce tu dirección para recibir tu propia copia.

Informar de un problema