Project Brupegvídeo
Winch Upgrade, Wet Sandblasting & More - Project Brupeg Ep.162
23 de julio de 2020 · 30 min · 27K visitas · Australia
Qué cubre este vídeo
The conversion of a sunken fishing trawler into an expedition vessel requires fabricating custom steel sliders for the boat's stabilizer system. Because standard C-channel steel in the required dimensions is unavailable from Australian suppliers, the crew welds four individual steel sections together to create the necessary deep-profile sliders.1:54 To ensure structural integrity, they straighten the welded sliders using a 12-ton jack and chain before sandblasting and applying rust-inhibiting paint.4:37
The project requires lifting 70kg batteries and heavy stabilizer wings to the roof.10:49 To facilitate this, the crew modifies an 800kg 240V electric winch by fabricating a custom, over-engineered steel mounting plate and strong back to secure it to the boat's stainless steel rails.14:11 They also repurpose a 24V four-wheel-drive winch, mounting it to a 100mm angle-iron brace clamped into a doorway to provide temporary, controlled lifting power for the stabilizer wings.26:23 These modifications allow for precise alignment and safer handling of heavy components during the ongoing refit.
Más de Project Brupeg
De Project Brupeg — mira el barco del canal, la tripulación y cada vídeo analizado.
The Sailing Directory Newsletter
Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que merecen tu tiempo de visionado. Introduce tu dirección para recibir tu propia copia.



