Sailing Triteiavídeo

Installing an Electric Windlass on Triteia After 9 years of Hauling up by Hand!

5 de marzo de 2026 · 35 min · 17K visitas · Langkawi

Tattooed sailor crimps cable beside windlass on Triteia

Qué cubre este vídeo

Installing an electric windlass on an Alberg 30 requires significant deck preparation, including drilling and over-drilling holes to seal the core with thickened epoxy before final mounting.7:29 The installation process involves fabricating a custom mounting pad, routing heavy-gauge battery cables from the anchor locker to the main battery bank, and installing a deck-mounted foot switch.26:56 When selecting wire gauge, the project highlights a discrepancy in some manufacturer manuals between metric and American Wire Gauge (AWG) specifications, necessitating careful verification of current requirements for the specific cable run length.20:18 The project also requires crimping heavy-duty battery terminals, which is simplified by using a dedicated hydraulic crimping tool.21:04 After troubleshooting initial wiring polarity issues, the electric windlass successfully retrieves the anchor chain under load.30:02 While the unit provides electric retrieval, the manual override function may require disassembly and servicing if seized or damaged.15:04

Ver en YouTube

Barcos en este vídeo

Alberg 30Su barco

Más de Sailing Triteia

Victoria Arrives to Victoria, Mahe, Seychelles and We Sail to Silhouette Islandago 2026Forney Cove on Santa Cruz Island From The Channel Islands Cruising Guideago 2026Dangerous Sailing in Coral Passes & Storms in the Maldives on a 30ft Sailboatago 2026Pushing Through The Maldives - Cruising in Paradise At the Wrong Time of Yearago 2026

De Sailing Triteia — mira el barco del canal, la tripulación y cada vídeo analizado.

The Sailing Directory Newsletter

Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que merecen tu tiempo de visionado. Introduce tu dirección para recibir tu propia copia.

Informar de un problema