RAN Sailingvídeo

Lamination Update: 1/3 Of Exterior Completed! - Ep. 374 RAN Sailing

8 de diciembre de 2023 · 21 min · 106K visitas · Skåne

Qué cubre este vídeo

Johan and Malin are laminating the cedar-strip hull of their 50-foot boat, reaching the one-third completion mark for the exterior.17:17 To improve consistency and reduce epoxy waste, they constructed a saturation table that allows them to calculate and apply precise amounts of resin per square meter of fiberglass.6:20 The process involves applying four layers of 600-gram fiberglass mat, with plans to add a final layer of twill weave to prevent print-through.18:54 Working in a barn during winter, they maintain a temperature of 14 degrees Celsius using electric heaters to ensure proper epoxy curing.4:10 Johan uses paper templates to determine the correct fiberglass lengths and overlap lines as the hull shape tapers toward the bow.13:02 They estimate the total exterior lamination will require 200 man-hours, excluding approximately 40 hours of preparation time.17:47 Future work includes laminating the interior with three layers of 600-gram mat and installing structural reinforcements for the keel and chain plates.19:37

Ver en YouTube

Más de RAN Sailing

There's No Manual For This! Building Our Own 52ft Sailboat - Ep. 506 Ran Sailingoct 2026Carbon Pillars & No Dorade Boxes! - Building Our 52ft Sailboat - Ep. 505 Ran Sailingoct 2026Will the Sanding EVER End? Building Our Dreamboat - Ep. 503 Ran Sailingsept 2026Something's Not Right Here! Building Our 52ft Sailboat - Ep. 502sept 2026

De RAN Sailing — mira el barco del canal, la tripulación y cada vídeo analizado.

The Sailing Directory Newsletter

Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que merecen tu tiempo de visionado. Introduce tu dirección para recibir tu propia copia.

Informar de un problema