Project Brupegvídeo

We made it to Australia's Most Northern Cape - Project Brupeg Ep.433

13 de enero de 2026 · 44 min · 17K visitas · Lockhart River

Qué cubre este vídeo

The 50-foot vessel *Brupeg* transits the northern coast of Queensland, Australia, navigating from Lockhart River to the northernmost point of the mainland, Cape York. The crew manages a 10-hour steam to Cape Grenville, followed by a passage through the tidal Albany Passage, where they encounter 15-to-18-knot winds and 1-meter swells.24:45 During the final approach to Cape York, the vessel runs aground on a sandbank in 2.5 meters of water after the *Navionics* chart plotter fails to provide accurate positioning.33:16 The crew uses *OpenCPN* and sonar charts to identify deep-water channels, noting that standard charts often lack the detail required to navigate around rock outcrops and shallow banks in the area.31:40 Upon reaching the wharf at Seisia, the crew contends with a 3-knot cross-tide to dock the vessel and offload approximately half a ton of marine debris collected during coastal cleanup projects.38:47 The experience confirms that relying on multiple navigation sources and sonar detail is essential when navigating shallow, current-heavy passages in remote northern Australian waters.

Ver en YouTube

Más de Project Brupeg

Was the outboard rebuild worth it and Brupeg has developed a worrying noise... Project Brupeg Ep.456ago 2026Three Builds, One Croc Sanctuary: Boat Life on Brupeg - Project Brupeg Ep.455ago 2026Brupeg's 1st Drone, Green Island & Boatwork - Project Brupeg Ep.454jul 2026Good Mates & Boat Maintenance - Project Brupeg Ep.453jul 2026

De Project Brupeg — mira el barco del canal, la tripulación y cada vídeo analizado.

The Sailing Directory Newsletter

Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que merecen tu tiempo de visionado. Introduce tu dirección para recibir tu propia copia.

Informar de un problema