pabloberrusailsvídeo

Day 8: A day with me in the boatyard!

14 de junio de 2024 · 1 min · 2K visitas

Qué cubre este vídeo

A day in the boatyard with Pablo Berrus covers three repair tasks on his boat. He cleans and removes old paint from a damaged hull section, then welds a new stainless steel plate over an anchor strike to restore thickness.0:11 He replaces the navigation light wiring, which had corroded and was making poor contact: he runs a new cable from the electrical panel to the navigation light, making fresh positive and negative connections.0:59 The wiring job takes several hours and is not fully documented.1:14 He ends the day with a running session.1:21 No location is named in the video, but the context is a boatyard haul-out. The navigation light fix confirms that corroded wiring causing intermittent contact requires full cable replacement from the panel rather than a spot repair.

Ver en YouTube

Más de pabloberrusails

Solo around-the-world sailing #23 - I reach the Sunda Strait and prepare for the Indian Oceansept 2026Sailing through the Strait of Malaccasept 2026I'm hauling the boat out of the water in Malaysiasept 2026Solo sailing around the world: How do I stay connected while traveling?ago 2026

De pabloberrusails — mira el barco del canal, la tripulación y cada vídeo analizado.

The Sailing Directory Newsletter

Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que merecen tu tiempo de visionado. Introduce tu dirección para recibir tu propia copia.

Informar de un problema