Sailing Supernovavídeo
Keeping the dream afloat (literally) [Ep. 98]
13 de junio de 2025 · 24 min · 25K visitas
Qué cubre este vídeo
The crew of Supernova performs several maintenance tasks while anchored, including electrical repairs and dinghy hull restoration. After troubleshooting a loss of power to the starboard aft head, the crew identifies a loose wire at the light switch and restores function to the 24-volt LED fixtures.2:41 To improve battery charging efficiency, they clean accumulated dust and bird droppings from the solar panels using a soft brush and water.6:14 The crew also plans to install a 24-volt to 12-volt DC-to-DC converter to properly power the bilge pumps.8:08 Finally, they haul out the dinghy to repair damaged fiberglass patches on the hull.9:49 They remove poorly adhered sections, sand the surface, and apply a new layer of thickened polyester resin to smooth the bottom.12:48 The crew confirms the repair is a temporary fix intended to last several years while they investigate a persistent water leak in the bilge.19:42
Más de Sailing Supernova
De Sailing Supernova — mira el barco del canal, la tripulación y cada vídeo analizado.
The Sailing Directory Newsletter
Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que merecen tu tiempo de visionado. Introduce tu dirección para recibir tu propia copia.



