Sailing Squibvídeo

Squib's Refit - Closing a thru-hull fitting - Final assembly of roof supports - Conduit installation /98

19 de diciembre de 2024 · 15 min · 701 visitas

Qué cubre este vídeo

Refitting the interior of the boat involves sealing a redundant through-hull fitting, installing conduit for navigation lights, and refurbishing storage drawers. After filling a through-hull opening with epoxy, the surface requires sanding with an eccentric sander and an angle grinder to smooth the interior curvature.1:48 The project includes routing 20mm conduit for electrical wiring through existing structural voids, using heat to bend the tubing to fit tight corners before securing it with thickened epoxy.3:27

Work on the storage cabinetry involves removing slide rails, sanding the plywood surfaces, and replacing original fasteners with stainless steel screws to ensure smoother operation.6:40 To prevent debris accumulation, epoxy fillets are applied to the interior corners of the drawers, a process performed in two stages to ensure clean, three-dimensional transitions.9:07 Final tasks include mounting ceiling support struts, which requires precise alignment and repeated adjustments to accommodate internal reinforcements.12:25 The process emphasizes structural integrity and surface preparation before final painting.

Ver en YouTube

Más de Sailing Squib

Sailing Squib - May 2026/3sept 2026Sailing Squib May 2026 /2ago 2026Sailing Squib - Contemporary Witnessjul 2026Sailing Squib - May 2026 /1jul 2026

De Sailing Squib — mira el barco del canal, la tripulación y cada vídeo analizado.

The Sailing Directory Newsletter

Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que merecen tu tiempo de visionado. Introduce tu dirección para recibir tu propia copia.

Informar de un problema