WEsailvídeo

Over Worked & Over Heated Boat Projects | Episode 135

22 de diciembre de 2021 · 14 min · 15K visitas · Sector Bahia

Qué cubre este vídeo

Refitting a boat for off-grid solar power requires significant structural modifications, including drilling through quarter-inch stainless steel plates to create wire chases.7:34 To route electrical cables from the roof to the engine compartment, the project involves removing support poles and clearing space by temporarily shifting the boom with the topping lift.2:35 The process necessitates removing heavy 150-pound batteries to access mounting bolts.2:54 Additional interior work includes finishing a storage space with furring blocks and epoxy paint to protect gear from fiberglass abrasion.1:08 Engine maintenance tasks include cleaning ports and reinstalling rebuilt fuel injectors.4:03 Due to extreme heat, work is limited to early morning and evening hours to avoid heat exhaustion.8:36 After completing the solar wiring and controller installation, the crew departs for a break in Colorado before returning to the vessel to continue the refit.11:55

Ver en YouTube

Más de WEsail

13 Knots, Big Seas & Dolphins at Sunset | Sailing Back to Fiji's Mainlandago 2026We Don't Know Where We're Going Next | Leaving Fulaga, Fiji & Sailing Somewhereago 2026We Ran Out of Gas Saying Goodbye | Our Last Days in Fulaga, Fijijul 2026Nobody Mentioned the Cave of Bones | Three Weeks in Fulaga, Fijijul 2026

De WEsail — mira el barco del canal, la tripulación y cada vídeo analizado.

The Sailing Directory Newsletter

Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que merecen tu tiempo de visionado. Introduce tu dirección para recibir tu propia copia.

Informar de un problema