Sailing Yabávídeo
Big BOAT restoration: Painting the bottom for LAUNCH day! — Sailing Yabá 200
31 de marzo de 2024 · 23 min · 125K visitas
Qué cubre este vídeo
The crew of Yabá prepares for launch by applying bronze primer and anti-fouling paint to the hull while finalizing the vessel's solar power system. Because anti-fouling paint should not remain exposed to air for more than seven days before immersion, the team delayed this step until the launch date was certain.13:41 Ben and MP, assisted by family members, power-wash the hull and apply two layers of primer to the bottom.3:03 Simultaneously, the crew completes the electrical installation by connecting four solar panels in series to a Victron MPPT charge controller.10:07 Using the Victron Connect app, they verify the system is successfully charging the battery bank, recording an output of over 1800 watts during a test.12:54 The team also clears debris from the shipyard crib to facilitate moving the boat toward the water.Watch These final preparations mark the transition from long-term restoration to imminent launch.
Más de Sailing Yabá
De Sailing Yabá — mira el barco del canal, la tripulación y cada vídeo analizado.
The Sailing Directory Newsletter
Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que merecen tu tiempo de visionado. Introduce tu dirección para recibir tu propia copia.



