Sailing SV Delosvídeo
Building a Boat Is NOT What You Think (Aluminum Catamaran Build Pt. 46)
21 de noviembre de 2025 · 29 min · 281K visitas
Qué cubre este vídeo
Construction of a custom aluminum catamaran requires a non-linear, interdependent workflow where structural, mechanical, and interior systems must be dry-fitted simultaneously.0:53 To prepare the hull for insulation, the crew removes temporary 18mm plywood flooring to install permanent flooring and cut access hatches for the galley sink, bus bars, and steering assembly.2:22 Because spray foam insulation would interfere with moving parts, the team uses 25mm closed-cell polyethylene foam around the steering shaft, routing small channels to ensure clearance.14:01 Before applying foam, all aluminum surfaces are cleaned and coated with Nyalic to prevent corrosion caused by moisture trapped under insulation.23:22 The project also includes installing a deck-mounted flat winder for the traveler, which requires cutting a hole in the roof and welding a custom backing plate to accommodate the motor shaft and flange.25:55 The crew emphasizes that escape hatches are essential safety features for catamarans to allow egress in the event of a capsize.15:53
Más de Sailing SV Delos
De Sailing SV Delos — mira el barco del canal, la tripulación y cada vídeo analizado.
The Sailing Directory Newsletter
Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que merecen tu tiempo de visionado. Introduce tu dirección para recibir tu propia copia.



