Sailing Supernovavídeo
We finally left the wall... But had to go back right away! [Ep. 93]
9 de mayo de 2025 · 43 min · 43K visitas
Qué cubre este vídeo
Supernova, a cruising vessel, experiences a throttle control failure while maneuvering away from a dock wall to accommodate a large clipper ship.1:27 The crew loses the ability to shift gears from the flybridge, forcing the co-host to operate the engine controls manually from the lower helm while the host relays positioning from the bow.1:25 After successfully re-docking, the crew addresses several maintenance projects, including repairing the onboard water system and installing new solar panels.4:19 The installation requires removing the boat's soft top and fabricating custom supports.19:11 Additionally, the crew replaces a faulty Victron Phoenix inverter with two Edecoa units, intending to have the original Victron unit professionally repaired.28:21 The crew also plans to custom-build a replacement dinghy lift using either aluminum or stainless steel.33:21 The project work remains ongoing as the crew manages power and water limitations while tied to the wall.
Más de Sailing Supernova
De Sailing Supernova — mira el barco del canal, la tripulación y cada vídeo analizado.
The Sailing Directory Newsletter
Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que merecen tu tiempo de visionado. Introduce tu dirección para recibir tu propia copia.



