Sailing Catalpavídeo
New Standing rigging for our ketch Rig Sail Boat Episode 425
30 de octubre de 2024 · 14 min · 12K visitas
Qué cubre este vídeo
The crew of the ketch Catalpa performs a deck and rigging refit while hauled out in a Mexican boatyard. After repairing water-damaged deck sections with KiwiGrip, the owners address corroded boom attachment points by drilling and tapping new holes for 5/16-inch bolts, using a drill-tap bit to ensure proper thread engagement.3:42 The standing rigging, manufactured by Hemmer Marine in Queensland, Australia, is fitted to the masts on-site.5:57 To ensure accuracy before the mast-stepping process, the crew lays out the new cables alongside the old ones to verify lengths.5:40 A professional rigger, Memo, traveled from Puerto Vallarta to oversee the rig inspection and installation.11:16 The project also includes installing new running rigging from Precision Sails and preparing for the addition of Lumitec spreader lights.11:59 The vessel remains in the yard awaiting space to maneuver the mast into position.10:43
Más de Sailing Catalpa
De Sailing Catalpa — mira el barco del canal, la tripulación y cada vídeo analizado.
The Sailing Directory Newsletter
Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que merecen tu tiempo de visionado. Introduce tu dirección para recibir tu propia copia.



