Project Brupegvídeo

Building a Boat Kitchen - BUILDING BRUPEG (Ep. 08)

22 de diciembre de 2017 · 6 min · 17K visitas

Qué cubre este vídeo

Damien and Rebecca sand the cabin exterior to remove paint runs caused by poor application under a tarp.0:26 The primary project involves installing a 3.5-meter-long kitchen bench that exceeds the width of the cabin door.4:06 To maneuver the bench into position, the crew guts the kitchen and bedroom areas and cuts a large section out of a structural interior wall.4:20 After swinging the bench through the opening, they reposition the wall section and weld it back into place.4:31 They use a 3-millimeter cutoff disc to create the initial opening, then tack and fully weld the panel to restore the bulkhead.5:24 The process requires stripping the interior cabinetry and bedroom fixtures to provide clearance for the oversized galley unit.3:58

Ver en YouTube

Más de Project Brupeg

What caused the steering to fail - Project Brupeg Ep.463oct 2026CHAOS! & our first Night Time Trailer Haul Out - Project Brupeg Ep.462sept 2026Look, It's possible we should have cleaned this before now... Project Brupeg Ep.461sept 2026The Ridiculously Powerful Davit Winch - Project Brupeg Ep.460sept 2026

De Project Brupeg — mira el barco del canal, la tripulación y cada vídeo analizado.

The Sailing Directory Newsletter

Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que merecen tu tiempo de visionado. Introduce tu dirección para recibir tu propia copia.

Informar de un problema