Joy Sailorsvídeo
We finished the repairs!!
6 de mayo de 2020 · 3 min · 2K visitas · Valencia
Qué cubre este vídeo
Pedro Jimenez discovers a broken engine mount stud while investigating excessive engine vibration in the engine room.0:24 To address the failure, he decides to replace all four silent blocks.0:34 He plans to use hydraulic jacks to lift the engine slightly to access and remove the damaged mounts.0:02 Simultaneously, the crew completes painting the boat's deck white and organizes the interior.2:21 Isaías, a crew member, constructs a temporary shelter over the dock using a tarp, a paddle, and bungee cords to protect the work area from rain while he replaces the boat's hatches.1:38 The project list also includes repairs to the autopilot system.0:50 The vessel remains in Valencia, Spain, as the owner prepares for an upcoming haul-out.2:39 Replacing the silent blocks requires lifting the engine block to access the mounting studs.0:30
Más de Joy Sailors
De Joy Sailors — mira el barco del canal, la tripulación y cada vídeo analizado.
The Sailing Directory Newsletter
Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que merecen tu tiempo de visionado. Introduce tu dirección para recibir tu propia copia.



