Sailing Miragevídeo

When things go wrong. Broken Rigging in the Gulf Stream - 450 NM from Florida to MoreHead City, NC

8 de julio de 2026 · 18 min · 2K visitas · Gulf Stream

Qué cubre este vídeo

While sailing a 420-nautical-mile passage from Florida toward Morehead City, North Carolina, Vlad experienced a failure of the mainsail clew attachment point. The metal ring connecting the clew to the boom broke under load, forcing him to consider diverting to Charleston for repairs. Instead, he performed a temporary field repair using a soft shackle and a secondary line to secure the boom, allowing him to continue his course. The soft shackle failed after three hours, requiring a second, reinforced repair using a repositioned car to reduce the angle of pull and additional safety lines. He maintained speeds of 8.5 to 10.5 knots while crossing the Gulf Stream before the wind died, necessitating 15 hours of motoring to reach Beaufort Inlet. Upon arrival at Portside Marina in Morehead City, he replaced the broken component with a new Harken part, which required drilling out the threads in the workshop to complete the installation.

Ver en YouTube

Barcos en este vídeo

Amel 50Su barco

Más de Sailing Mirage

From New York, NY to Cape Cod, MA | Flying 200 NM downwind at 9–10 Knots.ago 2026Sailing Through New York City | Manhattan, East River & Hell Gateago 2026Solo Sailing from Annapolis, Maryland to New York City | Chesapeake to Manhattanago 2026Preparing Mirage: Boat Repairs, Upgrades & a Chesapeake Bay Test Sail to Hooper Islandago 2026

De Sailing Mirage — mira el barco del canal, la tripulación y cada vídeo analizado.

The Sailing Directory Newsletter

Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que merecen tu tiempo de visionado. Introduce tu dirección para recibir tu propia copia.

Informar de un problema