Boat Life: Overhauling our Bilges | Preparing to Sail the World | Cruising Meraki Ep 14
31 de mayo de 2021 · 15 min · 2K visitas · Vancouver Island
Qué cubre este vídeo
The owners of a cruising sailboat are replacing compromised fuel and water storage systems by removing old, leaking bladders and cutting out original steel tanks.2:37 The previous owner had modified the original tanks by removing their tops and inserting flexible bladders, which failed and leaked into the bilge.6:46 To prepare for new custom tanks, the crew uses a manual hand pump to empty the remaining diesel, then cuts the bladder material into pieces for removal.5:11 They also remove oil-soaked spray foam insulation from the bilge area to clear access to the bilge pump.7:33 After creating a wooden template to ensure the new tank dimensions allow for passage through the companionway, they commission a custom stainless steel water tank with internal baffles and a draw pipe.12:55 Additionally, the crew performs minor repairs on a broken cabin door latch by installing a temporary screw to serve as a strike plate.10:42
Barcos en este vídeo
Más de Cruising Meraki • Sailing Family
De Cruising Meraki • Sailing Family — mira el barco del canal, la tripulación y cada vídeo analizado.
The Sailing Directory Newsletter
Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que merecen tu tiempo de visionado. Introduce tu dirección para recibir tu propia copia.



