Sailing Catalpavídeo
Preparations for the pacific continue Episode 491
17 de mayo de 2026 · 18 min · 10K visitas · Vista Mar Marina, Panama
Crew in hazmat suits paints Catalpa II's hull dry docked
Qué cubre este vídeo
The crew of a 50-something-foot sailboat hauls out at Vista Mar Marina in Panama to prepare for a Pacific Ocean crossing.4:11 The three-day maintenance schedule includes scraping the hull, wet-sanding, applying two coats of Total Boat Spartan anti-fouling paint, and replacing the propeller.6:46 The crew previously applied a Total Boat Epoxy Primer barrier coat, which remains intact despite heavy growth from a long stay in El Salvador.8:20 During the haul-out, the owner sustains a deep arm laceration from a power sander, requiring stitches from a neighboring boat owner who is a doctor.10:33 The crew also replaces their existing anchor with a 125-pound Mantis Marine M1, noting that the anchor's assembly bolts serve only as locators rather than load-bearing components.17:20 The vessel is lifted using a cradle system rather than traditional slings, which the crew finds more stable and quieter for the hull.2:13
Más de Sailing Catalpa
De Sailing Catalpa — mira el barco del canal, la tripulación y cada vídeo analizado.
The Sailing Directory Newsletter
Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que merecen tu tiempo de visionado. Introduce tu dirección para recibir tu propia copia.



