Plan-Seavídeo
SAILBOAT REFIT COMPLETE! Launching Next Week After Months on Land | (EP. 025)
30 de octubre de 2025 · 23 min · 4K visitas
Qué cubre este vídeo
A crew prepares a sailboat for launch by completing a series of final refit projects, including applying a coat of ablative bottom paint and installing a new windlass motor.0:04 To protect the windlass motor from salt water corrosion, the crew installs a plastic two-liter bottle housing over the unit.4:31 They also mount a custom-built barbecue grill base to the cockpit, replace the main, spinnaker, and jib halyards, and install a new engine impeller with a fresh O-ring.9:34 The crew uses a tracer line to pull new running rigging through the mast sheaves and goes aloft to attach a new topping lift.13:14 Additionally, they install a new swim ladder and configure Starlink for onboard internet connectivity.18:47 The crew plans to launch the vessel within one week to begin a passage to the Bahamas, acknowledging that some secondary projects will continue after the boat is in the water.16:43
Más de Plan-Sea
De Plan-Sea — mira el barco del canal, la tripulación y cada vídeo analizado.
The Sailing Directory Newsletter
Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que merecen tu tiempo de visionado. Introduce tu dirección para recibir tu propia copia.



