Sailing Oceanaire | Wik & Roxvídeo

Rebuilding Our Z-SPARS Furling Mechanism 🛠️ [Ep.16]

18 de abril de 2026 · 27 min · 6K visitas · Sicily

Wik holds rebuilt furling mechanism on sunny marina day

Qué cubre este vídeo

The crew of Oceanaire | Wik & Rox performs a DIY rebuild of a Z-SPARS in-mast furling mechanism while docked in Sicily.0:26 After the original unit seized due to failed bearings and excessive play, the owners sourced replacement bearings, castings, and a center rod directly from Z-SPARS in the UK.1:55 The repair process requires filing sharp edges off the new castings to allow the center rods to seat properly.22:35 Because the unit utilizes open ball bearings, the crew uses multi-purpose grease to hold the bearings in place during assembly to prevent them from falling out.25:17 The owner also applies zinc spray to the refurbished castings to prevent corrosion.19:29 Additionally, the crew splices new 12mm Gleissstein Mega Twin Dyneema halyards, using a method that retains the cover for a finished look.5:18 The furling mechanism shows no play after reassembly.26:20

Ver en YouTube

Más de Sailing Oceanaire | Wik & Rox

30 Knots Forced Us Into Greece's Clearest Bay [Ep.41]oct 2026One Second Later, I Was In The Water [Ep.40]oct 2026Sailing Greece: This Is What You Get [Ep.39]sept 2026MUST VISIT | The Ancient Wonders of the Peloponnese [Ep.38]sept 2026

De Sailing Oceanaire | Wik & Rox — mira el barco del canal, la tripulación y cada vídeo analizado.

The Sailing Directory Newsletter

Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que merecen tu tiempo de visionado. Introduce tu dirección para recibir tu propia copia.

Informar de un problema