Sailing NVvídeo
How to lift a race yacht with an EXTREME draft in a remote area | S2 Ep30
2 de noviembre de 2024 · 24 min · 9K visitas · South China Sea
Qué cubre este vídeo
The crew of the 66-foot yacht NV prepares to haul out for a saildrive replacement in a remote Borneo boatyard.0:15 The vessel’s 4.2-meter draft requires precise logistics, including digging a pit in the yard to accommodate the keel and ensure the boat sits safely on structural bulkheads.0:40 To reduce weight and clear space for internal repairs, the crew removes approximately 1,000 kilograms of sails, ropes, and gear, transporting the items to off-site storage.7:06 Before the lift, the crew measures water depths at the travel lift entrance and basin at low tide to confirm clearance, identifying a narrow margin for error depending on tidal height and positioning.11:07 The haul-out schedule remains subject to weather delays and yard coordination, requiring the crew to verify the digger’s availability and the structural support points for the boat’s cradle.23:09
Más de Sailing NV
De Sailing NV — mira el barco del canal, la tripulación y cada vídeo analizado.
The Sailing Directory Newsletter
Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que merecen tu tiempo de visionado. Introduce tu dirección para recibir tu propia copia.



