Sailing Catalpavídeo

Stripped naked in the boatyard Episode 417

18 de agosto de 2024 · 11 min · 12K visitas

Qué cubre este vídeo

The crew of the *Catalpa* is stripping, sanding, and refinishing their main mast and mizzen mast while in a boatyard.Watch To address surface corrosion and peeling paint, they are sanding the aluminum masts to bare metal using 80-to-240 grit sandpaper, with plans for a final 400-to-600 grit polish before applying Neuralac, a clear-coat polymer sealer.0:27 The crew opted for manual sanding over local sandblasting services after observing that the coarse media used on fishing boats leaves the aluminum too heavily etched for a smooth finish.4:14 During the process, they are inspecting all welds for cracks and addressing corrosion around mast fittings by oversizing screw holes and tapping new threads.2:58 Additionally, they are removing old incandescent spreader lights to install energy-efficient Lumatec LED units.8:51 The project also involves troubleshooting a seized furler bearing and managing electrolysis issues caused by stainless steel hardware on aluminum surfaces.8:34 Proper surface preparation and sealing are essential for preventing further corrosion on aluminum masts.

Ver en YouTube

Más de Sailing Catalpa

arriving to the most remote atolls on earth...the Tuamotussept 2026they weren't expecting thissept 2026one of the most remote islands on the planetsept 202629 days sailing Panama to French Polynesia the whole passageago 2026

De Sailing Catalpa — mira el barco del canal, la tripulación y cada vídeo analizado.

The Sailing Directory Newsletter

Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que merecen tu tiempo de visionado. Introduce tu dirección para recibir tu propia copia.

Informar de un problema