Project Brupegvídeo

Making Pulleys (part 1 of 2) - Brupeg Ep. 169

31 de agosto de 2020 · 33 min · 28K visitas

Qué cubre este vídeo

Damien and Trev align the port-side wing sliders on their vessel, Brupeg, to enable the wings to raise and lower safely.5:48 The team abandons a roof-mounted A-frame winch system in favor of a door-mounted winch, requiring the fabrication of custom pulleys and lifting points.3:34 They design a two-to-one purchase system using 6mm and 12mm stainless steel brackets, 16mm stainless rods, and 3-inch pulleys.22:34 To solve the issue of the wings being permanently trapped in the sliders, they plan to cut a gate into the slider assembly that can be bolted shut for maintenance access.17:30 The crew also prepares for a professional welder to address hull plating issues, including reinforcing the keel cooling pipe area and replacing degraded hull plates.0:07 By aligning the front and rear sliders and tacking the pulley brackets into position, the team achieves a stable, parallel configuration for the wing arms.10:52 Proper alignment and a robust pulley system allow for the safe, permanent operation of the wing lifting mechanism.

Ver en YouTube

Más de Project Brupeg

What caused the steering to fail - Project Brupeg Ep.463oct 2026CHAOS! & our first Night Time Trailer Haul Out - Project Brupeg Ep.462sept 2026Look, It's possible we should have cleaned this before now... Project Brupeg Ep.461sept 2026The Ridiculously Powerful Davit Winch - Project Brupeg Ep.460sept 2026

De Project Brupeg — mira el barco del canal, la tripulación y cada vídeo analizado.

The Sailing Directory Newsletter

Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que merecen tu tiempo de visionado. Introduce tu dirección para recibir tu propia copia.

Informar de un problema