Sampson Boat Covídeo

Installing the Capstan / hoisting topsails!

22 de junio de 2024 · 25 min · 534K visitas

Qué cubre este vídeo

Leo Goolden installs a cast-iron capstan on the deck of the 1910 gaff cutter Tally Ho.0:13 To prepare the mounting surface, he fabricates a teak plinth, using a router with a custom five-degree angled base to taper the central hole for the capstan’s main shaft.3:05 He machines the capstan’s four mounting holes to a uniform size and adds counterbores to accommodate custom-machined bronze nuts.4:49 The capstan components, along with a fisherman’s anchor and mainsheet jibe buffer, undergo flame spraying with zinc and a two-part marine paint finish to prevent corrosion.6:51 Leo dry-fits the assembly, drills through-deck holes for the drive shaft and control mechanism using a barefoot auger bit, and beds the base with 5/8-inch bronze bolts.22:01 Additionally, the crew hoists the full five-sail rig, including the topsail and flying jib, for the first time during a sea trial.9:29 Proper alignment of the capstan’s drive shaft and control linkage requires precise pattern-making and iterative dry-fitting to ensure clearance with the deck structure below.24:25

Ver en YouTube

Más de Sampson Boat Co

Sailing through the "Needles"oct 2026Sailing the British South coast!sept 2026Tally Ho meets a tidal mud-berth!sept 2026Tally Ho sails into England after 59 years overseas!ago 2026

De Sampson Boat Co — mira el barco del canal, la tripulación y cada vídeo analizado.

The Sailing Directory Newsletter

Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que merecen tu tiempo de visionado. Introduce tu dirección para recibir tu propia copia.

Informar de un problema