Wind Hippie Sailingvídeo

Dropping the Rudder to Replace the Bushings WHSE151

14 de octubre de 2024 · 27 min · 46K visitas · Townsville

Qué cubre este vídeo

To address a knocking sound in the transom-hung rudder of the 30-ft sailboat Gekko, the owner hauls the vessel at Rosshaven in Townsville, Australia, to replace worn bushings.0:32 Because the rudder’s bottom mounting plate features captive nuts that spin freely, the repair requires cutting access holes into the fiberglass skeg to reach and remove the hardware.9:37 After removing the rudder, the crew cleans the assembly, replaces the corroded bottom plate, and installs shaft repair sleeves to compensate for slightly oversized replacement bushings.17:16 To seal the access holes in the skeg, the crew inserts custom-cut PVC foam board plugs, coats them with epoxy mixed with colloidal silica, and finishes the surface with additional resin.21:20 The project also involves removing the wind vane and solar panel to clear the workspace, followed by applying three coats of antifouling paint to the rudder and skeg.4:34 Using high-quality 316 stainless steel hardware and nylock nuts ensures a secure, long-term connection for the rudder assembly.18:05

Ver en YouTube

Barcos en este vídeo

Cal 25Su barco

Más de Wind Hippie Sailing

The Red Bastard Strikes Again WHS189sept 2026Holly vs Entropy WHSE188ago 2026Here there be Whirlpools WHS187ago 2026In and Out and In Again WHS186ago 2026

De Wind Hippie Sailing — mira el barco del canal, la tripulación y cada vídeo analizado.

The Sailing Directory Newsletter

Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que merecen tu tiempo de visionado. Introduce tu dirección para recibir tu propia copia.

Informar de un problema