Wind Hippie Sailingvídeo
Dropping the Rudder to Replace the Bushings WHSE151
14 de octubre de 2024 · 27 min · 46K visitas · Townsville
Qué cubre este vídeo
To address a knocking sound in the transom-hung rudder of the 30-ft sailboat Gekko, the owner hauls the vessel at Rosshaven in Townsville, Australia, to replace worn bushings.0:32 Because the rudder’s bottom mounting plate features captive nuts that spin freely, the repair requires cutting access holes into the fiberglass skeg to reach and remove the hardware.9:37 After removing the rudder, the crew cleans the assembly, replaces the corroded bottom plate, and installs shaft repair sleeves to compensate for slightly oversized replacement bushings.17:16 To seal the access holes in the skeg, the crew inserts custom-cut PVC foam board plugs, coats them with epoxy mixed with colloidal silica, and finishes the surface with additional resin.21:20 The project also involves removing the wind vane and solar panel to clear the workspace, followed by applying three coats of antifouling paint to the rudder and skeg.4:34 Using high-quality 316 stainless steel hardware and nylock nuts ensures a secure, long-term connection for the rudder assembly.18:05
Barcos en este vídeo
Más de Wind Hippie Sailing
De Wind Hippie Sailing — mira el barco del canal, la tripulación y cada vídeo analizado.
The Sailing Directory Newsletter
Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que merecen tu tiempo de visionado. Introduce tu dirección para recibir tu propia copia.



