MJ Sailingvídeo
Bare Bottomed No More (MJ Sailing - EP 10)
27 de enero de 2017 · 15 min · 46K visitas
Qué cubre este vídeo
The crew prepares the hull of their boat for painting by grinding the surface with 36-grit paper and using a stainless steel wire wheel to clean weld joints.3:39 They apply two coats of strontium chromate primer, followed by five layers of Interprotect barrier coat to ensure a durable finish.7:17 To prevent oxidation, they apply primer in one-hour sections, wiping down the metal with a high-density foam roller immediately after grinding.5:18 The project also includes filling two small pinholes discovered in the hull after welding.1:24 Interior work focuses on running electrical wiring through 1.5-inch gray PVC conduit to prevent contact with the metal hull.11:39 The electrical system utilizes bus bars, duplex wire ranging from 10 to 16 gauge, and removable panels for maintenance access.12:14 Additional installations include a D400 wind generator regulator, a solar charger regulator, and a 1000-watt pure sine wave inverter.10:42 The interior walls feature a brushed paint finish to achieve a cottage-style aesthetic.8:29
Más de MJ Sailing
De MJ Sailing — mira el barco del canal, la tripulación y cada vídeo analizado.
The Sailing Directory Newsletter
Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que merecen tu tiempo de visionado. Introduce tu dirección para recibir tu propia copia.



