Project Brupegvídeo

Building Davits for our Trawler During a Heatwave - Project Brupeg Ep.388

19 de enero de 2025 · 30 min · 21K visitas

Qué cubre este vídeo

The owners of the trawler *Brewpeg* fabricate and install custom stainless steel davits to replace an inefficient centralized winch system for dinghy deployment.0:05 They use 65mm nominal bore, schedule 40, 316-grade stainless steel pipe for the davit arms, employing pipe miter templates to ensure precise, square cuts for welding.1:55 To manage the lifting lines, they weld custom D-shaped stainless steel plates to the ends of the davits, designed to hold shackles for external pulleys.8:49 The installation involves welding the davit arms to the boat's structure, a process complicated by high ambient temperatures that force the crew to work during early morning hours.2:11 For the lifting mechanism, they repurpose a 24-volt, 4,000-pound capacity winch originally intended for an engine room elevator project.22:41 The winch features Dyneema cable and is mounted under the roof for weather protection, with wiring routed through conduit to prevent snagging.23:42 The project remains incomplete pending the acquisition of a battery drill to finish mounting the control bracket.28:45

Ver en YouTube

Más de Project Brupeg

What caused the steering to fail - Project Brupeg Ep.463oct 2026CHAOS! & our first Night Time Trailer Haul Out - Project Brupeg Ep.462sept 2026Look, It's possible we should have cleaned this before now... Project Brupeg Ep.461sept 2026The Ridiculously Powerful Davit Winch - Project Brupeg Ep.460sept 2026

De Project Brupeg — mira el barco del canal, la tripulación y cada vídeo analizado.

The Sailing Directory Newsletter

Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que merecen tu tiempo de visionado. Introduce tu dirección para recibir tu propia copia.

Informar de un problema