sailing.directory
CanalesBarcosPreguntaSobre el proyecto
🇪🇸
🇺🇸English🇬🇧English (UK)🇲🇽Español (México)🇪🇸Español (España)🇫🇷Français🇮🇹Italiano🇵🇹Português (Portugal)🇧🇷Português (Brasil)🇬🇷Ελληνικά🇳🇴Norsk
Iniciar sesión
sailing.directory

Un índice de los canales de vela de YouTube — con búsqueda por tema y navegación por interés. Nuevos canales y barcos, indexados cada semana. Sin ruido.

Explorar

CanalesBarcosBuscarSobre el proyectoSugerir un canal

Creadores y legal

ApóyanosPara creadoresPrivacidadCondicionesDMCA

No es asesoramiento de navegación · © 2026

InicioCanalesBarcos

Más

BuscarPreguntaSobre el proyectoApóyanosPara creadoresIniciar sesión

Idioma

🇺🇸English🇬🇧English (UK)🇲🇽Español (México)🇪🇸Español (España)🇫🇷Français🇮🇹Italiano🇵🇹Português (Portugal)🇧🇷Português (Brasil)🇬🇷Ελληνικά🇳🇴Norsk

Modo de visualización

sailing.directory
CanalesBarcosPreguntaSobre el proyecto
🇪🇸
🇺🇸English🇬🇧English (UK)🇲🇽Español (México)🇪🇸Español (España)🇫🇷Français🇮🇹Italiano🇵🇹Português (Portugal)🇧🇷Português (Brasil)🇬🇷Ελληνικά🇳🇴Norsk
Iniciar sesión

Sailing Uma · vídeo

Our New Batteries: Double the capacity and half the weight (BUSES - Part 2) | Step 462

2 de noviembre de 2025 · 20 min · 123K visitas

Man gestures atop battery crates beside boat hull at dockside

Ver en YouTube

Qué cubre este vídeo

Dan and Kika on Uma are mid-refit, installing a new 48-volt lithium battery bank as the first major electrical system step.▶ 0:01 The previous setup — twelve Battle Born 12-volt 100 Ah LFP drop-in batteries wired in series-parallel to reach 48 volts — failed without warning two or three times over five to six years when the sealed internal BMS tripped on a fault, blacking out the entire boat and forcing a sail to a marina to reset via shore power.▶ 7:37 The new system uses ten Victron NG 100 Ah 48-volt batteries (no series wiring required), split into two banks of five: one in the cockpit locker, one under the companionway steps, separated by a watertight bulkhead.▶ 12:05 Total capacity is roughly 50 kWh — double the previous bank at half the weight.▶ 11:59 Victron was chosen over MG and EP Technologies for its waterproof plastic housing, the modular Lynx bus bar system, external BMS with networked monitoring, and known compatibility with their existing Oceanvolt motor system.▶ 12:33 A design problem remains: ABYC standards require each of the ten batteries to have its own Class T fuse within seven inches of the positive terminal, and no off-the-shelf compact fuse holder exists for the application, so a custom bracket solution is still being developed.▶ 16:59

Más de Sailing Uma

Uma is Ready to Launch! (But there's a catch) | Step 489jun 2026How Many Sails Does it Take To Replace a Diesel Engine? | Step 488may 2026Turning Our Powerboat Back Into a Sailboat | Step 487may 2026We Cut our Mast in Half | Step 486may 2026

De Sailing Uma — mira el barco del canal, la tripulación y cada vídeo analizado.

Informar de un problema
InicioCanalesBarcos

Más

BuscarPreguntaSobre el proyectoApóyanosPara creadoresIniciar sesión

Idioma

🇺🇸English🇬🇧English (UK)🇲🇽Español (México)🇪🇸Español (España)🇫🇷Français🇮🇹Italiano🇵🇹Português (Portugal)🇧🇷Português (Brasil)🇬🇷Ελληνικά🇳🇴Norsk

Modo de visualización

sailing.directory

Un índice de los canales de vela de YouTube — con búsqueda por tema y navegación por interés. Nuevos canales y barcos, indexados cada semana. Sin ruido.

Explorar

CanalesBarcosBuscarSobre el proyectoSugerir un canal

Creadores y legal

ApóyanosPara creadoresPrivacidadCondicionesDMCA

No es asesoramiento de navegación · © 2026