Catamaran Mistertong vídeo
#227 Making the struts
16 de junio de 2026 · 45 min · 7K visitas
Crew grinds hull under catamaran in dry dock
Qué cubre este vídeo
The owners of an Outremer catamaran, currently hauled out for an extended period in Carriacou, perform structural modifications and maintenance while awaiting a resolution to local marina access issues. The crew fabricates and installs new aluminum support struts for the boat's stern arch, requiring custom welding services from a local professional. To prepare for the installation, they remove an obsolete wind generator mount and modify the bimini structure to improve water drainage. Additional maintenance includes inspecting the anchor chain for corrosion, cleaning the chain locker, and applying primer to the hull. The owners source fiberglass materials and epoxy from local hardware stores, noting significant cost savings compared to marine-specific chandleries.13:05 They also address a mechanical issue with the windlass anti-reverse pawl, which will require removing the unit for repair. The project remains focused on completing structural work while the vessel is on the hard, despite ongoing uncertainty regarding the marina's operational status and launch schedule.
Más de Catamaran Mistertong
De Catamaran Mistertong — mira el barco del canal, la tripulación y cada vídeo analizado.
The Sailing Directory Newsletter
Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que merecen tu tiempo de visionado. Introduce tu dirección para recibir tu propia copia.



