Acorn To Arabellavídeo
Sailboat Winterization: Removing Sails, Fixing Corroded Hardware & Prepping for Haul-Out
21 de noviembre de 2025 · 29 min · 31K visitas · Cornerbrook, Newfoundland
Qué cubre este vídeo
Steve prepares the Barlow 24 for a winter haul-out in Cornerbrook, Newfoundland, by removing running rigging, sails, and corroded hardware. He strips the jib, main, and mizzen halyards, bundling blocks and lines as units to simplify spring re-installation.8:19 To prevent UV damage and facilitate deck maintenance, he removes the jib and mizzen boom, though he leaves the staysail in place to serve as a template for new stack packs.7:44 He plans to replace the existing stack packs, which show significant UV degradation and stitching failure, with new versions featuring improved drainage mesh, increased volume at the boom ends, and reinforced webbing to prevent halyard chafe against zippers.23:23 Additionally, he removes corroded brass-and-steel latch hardware from the tender’s dagger board, intending to replace them with salvaged hinges after filling the holes with graving pieces.0:28 Steve seeks a used Sailrite sewing machine and a spare Barlow 24 bronze winch to complete his winter maintenance projects.25:26
Más de Acorn To Arabella
De Acorn To Arabella — mira el barco del canal, la tripulación y cada vídeo analizado.
The Sailing Directory Newsletter
Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que merecen tu tiempo de visionado. Introduce tu dirección para recibir tu propia copia.



