Project Brupegvídeo
TIG like a Girl - Project Brupeg Ep. 174
5 de octubre de 2020 · 30 min · 22K visitas
Qué cubre este vídeo
The conversion of a steel trawler involves installing a temporary water tank in the engine room and constructing a studio desk for computer equipment.0:34 The installation requires fabricating a custom steel bracket to secure the tank, which is initially tacked with TIG welding before switching to MIG for final stitch welds to ensure a robust fit.17:48 The process includes routing cold water lines through one-micron filters and using structural adhesive, specifically Fixtech 190, to bond 60mm wooden battens to the steel hull for interior paneling.21:46 The project also addresses structural maintenance, specifically repairing rusted-out box-section ribs that trapped water and silt after the vessel previously went underwater.24:08 Surface preparation for painting involves wet blasting to create a key for zinc-rich epoxy, intentionally allowing light surface rust to form to improve the bond.20:37 The studio space is designed as a multi-purpose "think tank" for research and crew, featuring ergonomic desk heights and integrated shelving.22:47
Más de Project Brupeg
De Project Brupeg — mira el barco del canal, la tripulación y cada vídeo analizado.
The Sailing Directory Newsletter
Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que merecen tu tiempo de visionado. Introduce tu dirección para recibir tu propia copia.



