WEsailvideo
Marooned in Mo'orea- Without a Dingy for 10 days | Episode 201
26 de abril de 2023 · 31 min · 75K vistas · French Polynesia
¿Qué cubre este video?
A mechanical failure in the dinghy motor forces a 10-day stay in Mo'orea, French Polynesia, while the crew waits for replacement parts.8:41 The outboard motor’s lower unit gears suffered significant damage, rendering the dinghy inoperable for shore access.2:49 After failing to source the necessary components from local shops in Tahiti, the crew arranged for friends to transport the parts from the United States.6:57 While anchored, the crew utilizes the downtime to complete deferred maintenance projects, including rebuilding a custom chain flaker for the windlass using plywood and fiberglass, servicing the carburetor and fuel pump, and cleaning the hull.30:51 The crew also monitors solar panel efficiency during the wet season, noting increased output after rain showers cool the panels.29:44 Despite the delay in their planned passage to the Tuamotos and the Marquesas, the crew maintains their provisioning and continues boat repairs while awaiting the arrival of the replacement parts.
Más de WEsail
De WEsail — ve el barco, la tripulación y cada video analizado del canal.
The Sailing Directory Newsletter
Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que valen tu tiempo de visualización. Ingresa tu propia dirección para obtener tu propia copia.



