MJ Sailingvideo

NO Wear & Tear for the Cutlass Bearing on Our Home Built Catamaran (MJ Sailing - Ep 297)

12 de agosto de 2023 · 16 min · 54K vistas · Kent Island

¿Qué cubre este video?

Construction of the home-built catamaran continues with the bonding and glassing of the stern tubes and skegs on both hulls. To ensure precise alignment of the starboard strut, the crew uses a laser to verify the position of the stern tube relative to the hull center line.1:59 After bonding the skeg, they apply 12-ounce double-bias fiberglass, using metal rollers to remove air bubbles from the resin.8:54 The process proves difficult due to high temperatures causing the resin to kick prematurely and the new fiberglass roll resisting adhesion.12:31 Meanwhile, interior work focuses on fairing, coving, and sanding the owner’s berth and hallway.0:18 The crew prepares these areas for a final coat of Allgrip high-build primer, though progress stalls temporarily while awaiting a shipment of Allquick primer.14:58 To manage the stress of the long-term build, the crew incorporates daily meditation sessions and outdoor walks near the Chesapeake Bay.6:38

Ver en YouTube

Más de MJ Sailing

The Ultimate Off-Grid Upgrade: Unboxing 8 Lithium Batteries!oct 2026How Can a Light Switch Be SO COMPLICATED??!! (MJ Sailing - Episode 381)ago 2026Painting the Accent Walls On Our Home Built Catamaran (MJ Sailing - Episode 380)jul 2026The Details That Keep a Boat Dry (MJ Sailing - Episode 379)jun 2026

De MJ Sailing — ve el barco, la tripulación y cada video analizado del canal.

The Sailing Directory Newsletter

Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que valen tu tiempo de visualización. Ingresa tu propia dirección para obtener tu propia copia.

Reportar un problema